40HC Shipping Container Office

Zaściankowa 4, 51-501 Wrocław

Surface Area

71

Uploaded Image 74

Container Office in Wrocław – Modern Workspace by HARDBOX

Discover the innovative HARDBOX container office, located at ul. Zaściankowa 4 in Wrocław. This unique 71 sqm project combines modern design, functionality, and rapid deployment, characteristic of HARDBOX modular constructions. The use of 40 HC shipping containers, shortened to 1050 cm, and a 20 HC container, allowed for the creation of a space perfectly tailored to the client's needs.

Engineered Construction and Finishes

The office structure is based on a robust container frame, with thermal insulation made of 50 mm thick PUR foam, ensuring thermal comfort throughout the year. The interior is finished with oak joinery board, which gives it an elegant and modern appearance. User comfort is enhanced by RED SNAKE infrared heaters/heating film and Haier Tundra + air conditioners with a power of 5 kW.

Functionality and Comfort

The office consists of a spacious ground floor room (36.8 sqm), a WC (3.8 sqm), a social area/kitchen (5.0 sqm), and an upstairs room (26 sqm). An additional advantage is the 9.6 sqm terrace, made of closed profiles, ideal for outdoor relaxation. Electrical installations (three-phase 32A 400V connection) and plumbing (external water and sewage connection) ensure full functionality and user comfort.

The floor is finished with vinyl panels, and the floor thermal insulation is made of 150mm Thermano board.

Technical Specifications

Shipping Containers: 3 units of 40 HC shortened to 1050 cm, and 1 unit of 20 HC: • Containers (One Way) Structural Modifications: • Removal of walls and reinforcement of the lower level structure. • Removal of upper level walls • Stairwell and straight steel stairs (70 cm wide steps). Rooms/Layout: - Room 36.8 sqm - Ground Floor, including stairwell - Room 3.8 sqm - WC - Room 5.0 sqm - Social Area/Kitchenette - Room 26 sqm – First Floor, including stairwell Walls: • Thermal Insulation: 50 mm PUR foam. • Finish: Oak joinery board. Ceiling: • Thermal Insulation: 50 mm PUR foam. • Finish: Gypsum board (GK), latex paint. - Heating: RED SNAKE infrared heaters/heating film. Floor: • Finish: Vinyl panels. • Thermal Insulation: 150mm Thermano board. Electrical System (concealed wiring): • External connection: Three-phase 32A 400V. • Surface-mounted modular distribution board. • Up to 20 x 220V points, hermetic sockets with grounding and current path shutters. • 2 lighting circuits per room. Ventilation: • 2x Haier Tundra + Air Conditioners, 5 kW each. • Gravity ventilation. Plumbing: • Concealed Alupex plumbing installation. • External water and sewage connection. • 18 kW instantaneous water heater. Restroom/WC: • Compact WC unit. • Washbasin. • Underfloor heating. • Mechanical ventilation. • Shower cabin. Terrace: - 9.6 sqm. Constructed from 100x60mm; 70x30mm closed profiles.

Project Gallery

Final Project

Uploaded Image 86
Uploaded Image 77
Uploaded Image 79
Uploaded Image 82

Production Process

Uploaded Image 78
Uploaded Image 88
Uploaded Image 89
Uploaded Image 90

Other Images

Uploaded Image 85